BUILDING ENVELOPE & WATERPROOFING
The Roof Stops at the Edge. The Building Envelope Doesn't.
A roof replacement that ignores compromised facade, failed window sealants, or missing air barriers will leak again within years. AOD manages the full weather barrier — roofing first, then the envelope systems that complete the picture.

Waterproofing Systems
Plaza decks, below-grade walls, parking structures, mechanical pits, and foundation walls. Sheet-applied and liquid-applied membrane systems. Critical companion to roofing on complex facility types where roof-to-wall transitions are primary infiltration sources.
Facade & Exterior Wall Restoration
Masonry repointing, concrete repair, EIFS remediation, and exterior coating systems. Specified when building envelope survey reveals wall-to-roof transitions and deteriorated masonry are contributing to infiltration the roof alone cannot solve.
Window Glazing & Curtain Wall
Sealant replacement, reglazing, curtain wall water infiltration remediation, and frame repair. Window failure is among the most common sources of interior moisture damage in facilities undergoing roof replacement.
Air/Vapor Barriers
Continuous air barrier installation and repair. Energy code compliance under ASHRAE 90.1 and UFC energy standards. Coordinated with roofing scope to ensure continuous protection through the wall assembly.
Joint Sealants & Penetration Seals
Building expansion joints, penetration seals, perimeter sealant replacement, and transition seals. AOD includes sealant survey in every RAMP™ assessment — sealant failure is the most overlooked source of building infiltration
