EMERGENCY RESPONSE & RISK MITIGATION
Emergency Response. Risk Identified Before It Becomes One
AOD's emergency and risk services cover both ends of the failure curve — pre-project surveys that find risk before it becomes an emergency, and rapid deployment when a facility roof fails without warning.

Emergency Response
Rapid Mobilization
24-hour direct contact — not an answering service. Nationwide mobilization from Weatherford, TX (DFW metro). Background-screened, base-access-credentialed workforce eliminates credential delay at secure federal facilities
Temporary Protection
Immediate deployment of temporary waterproofing — tarping, spray-applied coatings, temporary flashing. Photographic documentation from first arrival for insurance, adjuster, and contract modification records.
Damage Assessment Report
Formal report within 24 hours: cause of failure, extent of damage, photographic documentation, and recommended permanent repair scope. Formatted for federal modification packages, state procurement, and commercial insurance claims.
Emergency-to-Permanent Transition
AOD manages transition from emergency protection to permanent replacement under the same contract structure where possible — eliminating re-procurement delay
PRE-PROJECT RISK MITIGATION SURVEYS
The most expensive problems in roofing occur after the contract is signed. AOD's pre-project surveys find them before they
become change orders.
Infrared Moisture Survey
Thermographic scanning identifies subsurface wet insulation and membrane delamination invisible to visual inspection. Moisture maps define the true scope of replacement. Included in RAMP™ enrollment and available as standalone pre-bid service.
Core Sampling & Substrate Assessment
Physical core cuts to assess membrane condition, insulation moisture, fastener pull-out strength, and substrate compatibility with proposed new system. Results documented on roof plan.
Drainage Capacity Assessment
Drain locations, sizes, overflow capacity, and slope adequacy assessed on every survey. Remediation recommendations
specified before replacement, not discovered mid-project.
Risk Documentation for Federal Contracts
Formal pre-construction risk register for complex federal projects. Submitted with pre-construction conference materials.
Reduces CO-disputed change orders during execution.
Hazardous Material Identification
Pre-1980 facilities frequently contain asbestos-containing materials in BUR felts and insulation. AOD coordinates ACM survey prior to any tear-off and manages abatement contractor scheduling.
